Product Details:
Payment & Shipping Terms:
|
External Wall: | 100 Or 50mm ALC Panel/WPC Board/fibre Cement | Insulation: | Glass Wool/EPS/XPS/PU Sandwich Panel |
---|---|---|---|
Frame Material: | 0.75mm/0.95mm/1.15mm Steel Frame With AZ150 Zinc Coating | Ceiling Material: | MGOboard/ Gypsum Board+others |
Floor: | Laminate/wooden/tile | Door: | Metal Security Door/Pvc Sliding Door |
Roofing: | EPS Sandwich Panel/steel Roofing/asphalt | Other Fitting: | Toilet, Washbasin,shower ,kitchen,etc |
Light Steel Frame Wooden Home Beach Bungalows With Shower , Kitchen
Quick Detail:
Name |
Wooden bungalow |
Application |
Wooden bungalow for holiday living |
Color |
Yellow,white,etc depend on customer’s request |
Feature |
1.quickly to assemble on site 2.good earthquake proof 3.green,energy save 4.design for customers |
Material |
light steel and other parts material |
Certificate |
CE,ISO,SAA,ETC |
Description:
Main structure: Light Gauge Steel
Wall cladding: ALC panel/fibre cement cladding+MGO board/gypsum board
Insulation material: glass wool or also EPS/XPS/PU sandwich panel
Ceiling material: MGO board/gypsum board
Roof: EPS sandwich panel/steel roofing/asphalt shingle
Flooring: laminate flooring/wooden/PVC carpet
Door: steel security door/WPC or wooden door
Window: aluminum alloy/PVC
Other fittings: toilet,washbasin,shower,kitchen etc.
Life time: 100 years for structure
Applications:
toilet,washbasin,shower,kitchen etc.
Specifications
light steel framing bali prefab wooden houses:
ISO standard light gauge steel for main structure.one or two also three floors available.fireproof,heat insulation,wind and earthquake resistance.green,energy save. economically.
Design code:
(1)AISI S100 North American Specification for the Design of Cold Formed Steel Structural Members published by the American Iron and Steel Institute (AISI) in the United States.
(2)AS/NZS 4600 Australian/New Zealand Standard-Cold-formed steel structures jointly published by Standards Australia and Standards New Zealand.
(3)BS 5950-5 Structural use of steelwork in building-Part 5. Code of practice for design of cold formed thin gauge sections published by BSI in the UK.
(4)ENV1993-1-3 means Eurocode 3: Design of steel structures; Part 1.3: General rules, Supplementary rules for cold-formed thin gauge members.
Why Choose Light Gauge Steel Structure?
1)Lifetime for structure: 100 years.
2)Earthquake resistance: mix more than 8 grades.
3)Wind resistance:max 60m/s.
4)Fire resistance:all the materials used can be fire resistance.
5)Snow resistance:max 2.9KN/m²as required
6)Heat insulation:100 mm in thickness can match 1 m thickness of brick wall.
7)High acoustic insulation:60db of exterior wall 40db of interior wall
8)Insect prevention: Free from the damages by insects, such as white ants
9)Ventilation:a combination of natural ventilation or air supply keep the indoor air fresh and clean
10)Packing and delivery: 140SQM/ 40'HQ container for structure only and 90SQM/ 40'HQ container for structure with decorate materials.
11)Installation:the average is one worker one day install one SQM.
12)Installation guide:dispatch engineer to guide on site.
Material Configuation:
No. |
Item |
Materials |
Luxury house |
No. |
Item |
Materials |
Luxury house |
1 |
Foundation |
Fixing to Foundation |
chemical bolt |
6 |
Roof system |
roofing |
ceramic/asphalt shingle |
cushion tape between frame and foundation |
asphalt tape |
water-proof layer |
heavy duty asphalt layer |
||||
2 |
House Structure System |
Main sturcture for house |
1.15mm thk *89mm wide Steel frame |
strength board |
15mm OSB board |
||
Floor Joist (if multi stories) |
1.15mm steel joist |
Insulation/batt |
heavy duty glass wool |
||||
Connection |
self-drilling scress |
eaves board |
12mm MgO board |
||||
3 |
Exterior Wall |
Ext. wall Cladding |
50MM ALC PANEL or PU sandwich panel |
downpipe system |
PVC downpipe system |
||
Reinforce layer |
12mm OSB board |
7 |
Kitchen and bathroom |
Kitchen cabinet |
high quality cabinet |
||
Vapor barrier |
DUPONT Vapor barrier sheet |
wall cabinet |
high quality wall cabinet |
||||
Insulation/batt |
heavy duty glass wool |
counter top |
stone counter top |
||||
inter of ext .wall |
double 12mm plaster board |
Sink |
high quality stainless sink with faucet |
||||
4 |
Interior Partition wall |
siding |
double 12mm plaster board |
toilet |
high quality toilet |
||
cornering |
high quality plaster cornering |
bathtub |
high quality bathtub |
||||
Skirting |
solid wood and tile |
shower |
high quality shower |
||||
5 |
Floor System |
sub floor for ground floor (Wet area ) |
NULL |
8 |
Doors and windows, plumbing |
Exterior door |
security door |
Sub floor for other floor ( Wet area ) |
20mm fiber cement board |
windows |
double glass Alum. Windows |
||||
flooring for gound floor (dry area) |
wooden flooring |
interior door |
high quality plywood door |
||||
flooring for gound floor ( wet area) |
high quality ceramic tile |
hot&cold water pipe |
hig quality PPR PIPE |
||||
Flooring for other floor (wet area) |
high quality ceramic tile |
Downpipe |
high quanlity PVC downpipe |
||||
Flooring for other floor dry area |
wooden flooring |
9 |
Electrical system and multi media |
telphone cable |
included |
||
Insulation |
glass wool |
TV. CABLE |
included |
||||
Ceiling for dry area |
12mm plaster board |
internet cable |
included |
||||
ceiling for wet area |
PVC ceiling |
electrical cables |
included |
||||
stairs (If have) |
steel stairs with armrest |
lighting |
ceiling light |
||||
notice: |
distribution box |
Included |
|||||
1 |
EX.W mean EX.works, pls find explaination from wikipedia |
switch |
Included |
||||
2 |
This price does not include foundation ,cement works and any other cost. |
11 |
Others |
INSTALLATION FEE |
Optional |
||
3 |
This price does not include design fee. |
SUPERVISOR |
Optional |
||||
4 |
This price does not include any furnitures and others. |
||||||
5 |
This price is only for listed materials |
||||||
6 |
All electrical is based on Chinese standard equipments. |
||||||
7 |
The total widnows area is no more than 15% of building area. The ceiling height is calculated 2.5m. |
||||||
8 |
Final price need to be confirmed based on final drawings and order-confirm-letter. |
||||||
9 |
If you have any questions, pls contact DEEPBLUE. |